Milligan Residence 8-21-08
We selected the countertop for the Kitchen and Sandria’s bathroom today.
The drywall company resumed work today. Everything is looking good! (see photos).
Look at the backyard! Too much water!
We selected the countertop for the Kitchen and Sandria’s bathroom today.
The drywall company resumed work today. Everything is looking good! (see photos).
Look at the backyard! Too much water!
We made it though this super bad storm. We went out this morning and lots of water everywhere. It was hard to drive in some areas.
We took a ride over to the house to see how things were. The yard was almost completely covered in water due to the over flow of the lake. We’re going to add fill to the yard to try to minimize this type of flooding in the future.
Insulation is complete. We had all of the interior walls insulated for sound. I also included photos of my network room/closet.
The interior of the house is still being worked on. The electrician should be finish by Tuesday. Low voltage should be done by Friday.
What’s been done since the last update?
Photos:
Given that I had to drive the 105 miles to handle the well and septic permits, I decided to stop by the house to check on things. Here are photos from today.
We started working on the house again in April. The framing and HVAC rough have been completed. Today the pool began. Here are two photos I took.
Lots of work has been done. They finally put the felt on the roof. Most of the framing on the inside has been completed. The electrician started working this week. The house is looking great on the inside. Here are some photos.