Milligan Residence: 5-12-08
Given that I had to drive the 105 miles to handle the well and septic permits, I decided to stop by the house to check on things. Here are photos from today.
Given that I had to drive the 105 miles to handle the well and septic permits, I decided to stop by the house to check on things. Here are photos from today.
We started working on the house again in April. The framing and HVAC rough have been completed. Today the pool began. Here are two photos I took.
Lots of work has been done. They finally put the felt on the roof. Most of the framing on the inside has been completed. The electrician started working this week. The house is looking great on the inside. Here are some photos.
The roof is on and the windows are in. Tomorrow they are supposed to put the sheathing on the roof and install the French doors. This week the framing should being. We found a company to do the screen enclosure and we also modified the pool by removing two feet from its length. Here are some of the photos I took today.
I spent a few hours designing our new kitchen layout. I did 11 different designs and we decided to go with the one you see below. We have a U-shaped kitchen and here are the two main walls. Let me know what you think.
This drawing has been sent to the kitchen cabinet designers so they can redo it with their software.
Alright!!! The second floor is up. The house looks massive now. The roof should be on by next weekend.
I received my new Windows Mobile 6 phone today. After a lot of research I decided to go with the s710. I’m going to fool around with it to see if it works the way I expect it to.
Phone Highlights
After weeks of rain and delays, the sub-floor for the second floor is about ready to be poured. The wood shown in the photos is only to support the floor when its poured.