The interior of the house is still being worked on. The electrician should be finish by Tuesday. Low voltage should be done by Friday.

What’s been done since the last update?

  • The septic system installed
  • Well installed
  • Stucco trim and lath work were completed
  • Windows and door removed and reinstalled
  • Plumber finished
  • Roof tiles loaded
  • Pool tiles and coping installed
  • Land cleared in the back
  • Cut down and reshaped the privacy wall
  • Electrician is almost done

Photos:

Milligan Residence: 5-16-08

Milligan Residence: 5-12-08

Given that I had to drive the 105 miles to handle the well and septic permits, I decided to stop by the house to check on things. Here are photos from today.

Pool Started

We started working on the house again in April. The framing and HVAC rough have been completed. Today the pool began. Here are two photos I took.

Milligan Residence 4-20-08

Photo updates

Milligan Residence - Week 21

Lots of work has been done. They finally put the felt on the roof. Most of the framing on the inside has been completed. The electrician started working this week. The house is looking great on the inside. Here are some photos.

Front ViewLeft side of the houseKitchenView from Family RoomView from Family RoomMaster bedroomUpstairs above dining roomMedia Room above DenInside balcony over foyerDen and Master suite entryRight side of the housegarage roofView from garage thoughUpstairs view towards game roomDMJ's closet and part of his roomDining Room with archesSandra's showerRecessed lighting housingMaster Suite hallwayCeiling inside master bedroomInside the master bed room.Arches at patio and balconyRecessed lighting installed outside the upstairs game roomRear viewBack view from the right

Milligan Residence - Week 17

The roof is on and the windows are in. Tomorrow they are supposed to put the sheathing on the roof and install the French doors. This week the framing should being. We found a company to do the screen enclosure and we also modified the pool by removing two feet from its length. Here are some of the photos I took today.

Roof over hanganother shotLeft side of the houseFull rear viewRight side of the hose, they fixed the kitchen windowsRight side of the houseGame room & nooksFamily room & nooksMaster bedroom and part of living roomview from the backwindows in the living roomLooking from the garage to the family roomDoors sitting in the garageDining RoomLooking upstairsLooking upstairsFront Exterior

Milligan Residence - Kitchen Design

I spent a few hours designing our new kitchen layout. I did 11 different designs and we decided to go with the one you see below. We have a U-shaped kitchen and here are the two main walls. Let me know what you think.

Kitchen Design by D.Milligan

This drawing has been sent to the kitchen cabinet designers so they can redo it with their software.

Milligan Residence - Week 14

Alright!!! The second floor is up. The house looks massive now. The roof should be on by next weekend.

FrontFrontGame room BalconyInside the master suitePatioDining room / KitchenView from the garage to family roomSandria's roomView from the backRight side of the houseAbove the guest toomRight side of the house - DMJ's roomRight side of the houseGarageFront of the house

Milligan Residence - Week 13

After weeks of rain and delays, the sub-floor for the second floor is about ready to be poured. The wood shown in the photos is only to support the floor when its poured.

View from the pool area toView from the pool area to patioView from the pool area to breakfast nookView from patio to family roomMore support beams where stairs will be locatedRight sideLaundry roomCeiling above laundry roomLooking toward breakfast nookLaundry room and entryLooking toward the dining roomOver the garageFrontFront EntryHer bath and Privacy WallLeft side